Your Ad Here

New Post/Thread Notification: ABAP HR Forum

Hello,

welcomewiki has just posted in the ABAP HR Forum forum of Wiki Newforum under the title of Sample Layout Of A Request To Develop Report.

This thread is located at http://www.wikinewforum.com/showthread.php?t=5946

Here is the message that has just been posted:
***************
This is what an abap report request looks like.

*INTRODUCTION*

To generate a SAP application, for handling the losses related to planned quantity and actual quantity.

*PRESENT SYSTEM*

*1.) DAILY BASIS:* - On the daily basis. 90 metric ton is DCS meter reading and confirm the same in PP order. 10 metric ton is loss.
1.) Physical Verification is 100 metric ton.
2.) DCS* Meter Reading is 90 metric ton i.e. 10 metric ton loss.

*2.) MONTHLY BASIS: *- 1000 metric ton for 1 month.DCS meter reading ( 900 ) in PP order confirmation.
1000-900 = 100 (put up in screen).
100 for 'A' material in screen for lime alkali.

*PROPOSED SYSTEM*
Generate the application on any date of the month. 1 PP Order can have 1 posting date and 1 BOM. From 1st to 15th day of the month; we can have 5 quantity loss and from 16th to 30th day of the month we have 10 quantity loss.. Stock and actual consumed are same.

_*Input to the screen include :- *_

1.) Material
2.) Period
3.) Header Material
4.) PO Header

Within the PP Order (Raw Material having sort string is DCS-HDLL; that is specified in BOM). Pick up. User put handling loss and save. Back processing is selected in PP order ;open in change mode. Calculate % loss and in every PP order add a new line item with new movement type.

100 (select the PP Order where there is lime alkali.) This is raw material. To find the total quantity.

Now for 1st PP order there is 100 tons of lime alkali.
Then for 2nd PP order there is no lime alkali.

Select lime alkali for raw material for lime alkali in all =
Production Order / Handling loss quantity entered by user
1 metric ton loss = 2000/100 = 20 metric ton.

Open all production orders in change mode. Insert new line item in production order.

For 1 final product quantity of BOM used = Number of metric ton used * 1 metric ton loss = 200.
***************

Your Ad Here

FREE TRAINING By World's No.1 Site Wikipedia

Hi

Here the SAP HR Real Blue Print: http://www.wikinewforum.com/showthread.php?t=1410


Join us World's Best FREE SAP HR Training @ www.wikinewforum.com


Online Training (Any time you can log-in)

FREE SAP HR TRAINING

WITH REAL TIME SCREEN SHOTS

By World's No.1 Site Wikipedia



Duration: 40 Days Venue: Wikipedia Website

Timings: Any time you can open and can take training

Support: Any time 24/7

We called as Special training because:

  • Real Time Employees will teach & answers your queries
  • Real Time Scenarios
  • Real Time System screen shots step by step configuration
  • Post training support like Resume & Interview tips with exact requirement, we provide top companies HR email ID's and every day vacancy list.

Special Topics apart from general topics:

  • We teach special topics like following where no any dare to reach
  • Payroll & Time Schema's
  • Payroll & Time PCR's (Personal Calculation Rules)
  • Rates of Pay
  • Factoring/Pro-ration
  • Wage type Valuation
  • Time Quota's & Time Types
  • Time Evaluation
  • Absence Valuation
  • Integration wit FICO & other Modules
  • And more and more....list will not stop
  • Totally End-to-End implementation Process

Visit our Website

www.wikinewforum.com

Free Demo

http://www.wikinewforum.com/showthread.php?p=10222#post10222

Reach us

info@wikinewforum.com

Presented

World No. 1 Site - Wikipedia

Our Aim is to provide FREE SAP Training, hope you join.